Step 1/11 — Preparatory work

Is preparatory work necessary?

Installation of scaffolding

  Installation of scaffolding


Removal of tiles

  Removal of tiles


Removal of wooden framework

  Removal of wooden framework


Removal of gutters

  Removal of gutters


Demolition of masonry walls

  Demolition of masonry walls

Step 2/11 — Masonry

Do you want to have the masonry done?

Floor with beams and hollow blocks

  Floor with beams and hollow blocks


Installation of a wooden floor

  Installation of a wooden floor


Creation of a level in traditional concrete block (calculation based on the created ground area)

  Creation of a level in traditional concrete block (calculation based on the created ground area)


Creation of a level in hollow bricks (calculation based on the created ground area)

 


Leveling screed

  Leveling screed


Opening in a wooden floor for the installation of a staircase

  Opening in a wooden floor for the installation of a staircase


Opening in a concrete floor for the installation of a staircase

  Opening in a concrete floor for the installation of a staircase

Step 3/11 — Framework/Roofing

Do you want to have the framework/roofing done?

Wooden frame with 2 slopes (calculation based on the created ground area)

  Wooden frame with 2 slopes (calculation based on the created ground area)


Tile roofing and accessories (calculation based on the created ground area)

 


Concrete flat roof including waterproofing

 


Wooden flat roof including waterproofing

 

Step 4/11 — Facade renovation

Do you want to carry out a facade renovation?

Single-layer facade coating

  Single-layer facade coating


Lime facade coating

  Lime facade coating


Painting primer

  Painting primer


Facade painting

  Facade painting

Step 5/11 — Plastering - Insulation

Do you need to insulate, partition, and/or install a door?

Plasterboard false ceiling under the slopes

  Plasterboard false ceiling under the slopes


Insulation under the slopes (R = 6.25 m².K/W)

  Insulation under the slopes (R = 6.25 m².K/W)


Partition wall

  Partition wall


Surcharge for water-resistant plasterboard

  Surcharge for water-resistant plasterboard


Communication door

  Communication door


Wall lining partition

  Wall lining partition


Mineral wool wall insulation

  Mineral wool wall insulation

Step 6/11 — Electricity

Are there any electrical works to plan?

Electrical panel for studio, F1-F2

  Electrical panel for studio, F1-F2


Communication cabinet for wired internet network

  Communication cabinet for wired internet network


Green-yellow earth cable

  Green-yellow earth cable


Electrical distribution for bathroom

  Electrical distribution for bathroom


Electrical distribution for WC

  Electrical distribution for WC


Electrical distribution for a bedroom

  Electrical distribution for a bedroom


Electrical distribution for corridor or landing

  Electrical distribution for corridor or landing

Step 7/11 — Plumbing and installation of elements

Do you want to install sanitary equipment (toilet, shower, sink cabinet ...)?

Modification and creation of the networks necessary for the installation of new elements in a bathroom

  Modification and creation of the networks necessary for the installation of new elements in a bathroom


Installation of a shower tray

  Installation of a shower tray


Installation of a shower wall or door

  Installation of a shower wall or door


Installation of a shower column

  Installation of a shower column


Installation of a vanity unit including the installation of a basin and faucet

  Installation of a vanity unit including the installation of a basin and faucet


Installation of a toilet

  Installation of a toilet


Installation of a wall-mounted toilet

  Installation of a wall-mounted toilet


Drywall covering for a wall-mounted toilet (excluding painting)

 

Step 8/11 — Radiators/Ventilation/Hot water tank

Do you want to install a new hot water tank, a ventilation system or a towel dryer?

Power supply for devices such as water heaters, VMC, radiators

  Power supply for devices such as water heaters, VMC, radiators


Installation of a water heater

  Installation of a water heater


Installation of a humidity-controlled single-flow VMC

  Installation of a humidity-controlled single-flow VMC


Installation of an electric radiator or towel warmer

  Installation of an electric radiator or towel warmer

Step 9/11 — Wall tiles

Should wall tiling be planned?

Waterproofing of the wet room under the wall tiles

  Waterproofing of the wet room under the wall tiles


Wall tile installation only

  Wall tile installation only

Step 10/11 — Coatings and painting

Do you want to have the painting done?

Painting work on new surfaces (Walls and ceilings)

  Painting work on new surfaces (Walls and ceilings)

Step 11/11 — Floor covering

Do you want to install tiles or parquet?

Tile installation only (excluding tile supply)

  Tile installation only (excluding tile supply)


Installation of tile skirting boards

  Installation of tile skirting boards


Installation of laminate flooring

  Installation of laminate flooring


Wood skirting

  Wood skirting