Step 1/2 — Preparatory works - Earthworks

Is it necessary to dig and/or remove soil?

Excavation of the ground to a depth of 20 cm

  Excavation of the ground to a depth of 20 cm


Removal and disposal of soil at public landfills

  Removal and disposal of soil at public landfills

Step 2/2 — Slab and Tiling

Is it necessary to plan a concrete slab and/or the installation of tiles?

Concrete slab 15 cm thick including reinforcement.

  Concrete slab 15 cm thick including reinforcement.


Installation only of tiles (excluding supply of tiles)

  Installation only of tiles (excluding supply of tiles)