Step 1/8 — External thermal insulation

Do you want to carry out external thermal insulation?

Setting up scaffolding

  Setting up scaffolding


Insulation of walls from the outside with 120 mm EPS (R = 3.85 m².K/W)

  Insulation of walls from the outside with 120 mm EPS (R = 3.85 m².K/W)


Accessories for shutter on window - ITE 120 mm

 


Accessories for shutter on French door

  Accessories for shutter on French door


External wall insulation in 140 mm EPS (R = 4.50 m².K/W)

  External wall insulation in 140 mm EPS (R = 4.50 m².K/W)


Accessories for shutter on window

  Accessories for shutter on window


Accessories for shutter on French door

  Accessories for shutter on French door


External wall insulation in EPS 160 mm (R = 5.15 m².K/W)

  External wall insulation in EPS 160 mm (R = 5.15 m².K/W)


Accessories for hinged shutters on window

  Accessories for hinged shutters on window


Accessories for hinged shutters on French door

  Accessories for hinged shutters on French door

Step 2/8 — Insulation of interior walls

Do you want to insulate your walls from the inside?

Demolition of tiled skirting boards

  Demolition of tiled skirting boards


Removal of wooden skirting boards

  Removal of wooden skirting boards


Demolition of existing drywall

  Demolition of existing drywall


Wall insulation (R= 3.75 m²K/W)

  Wall insulation (R= 3.75 m²K/W)


Wall lining partition

  Wall lining partition


Painting work on new surfaces (Walls and ceilings)

  Painting work on new surfaces (Walls and ceilings)


Installation of wooden skirting boards

  Installation of wooden skirting boards


Small electrical modification

  Small electrical modification


Removal of the existing radiator and installation of the new unit.

 

Step 3/8 — Insulation of sloping attics

Do you want to insulate the slopes?

Insulation under the slopes (R = 6.25 m².K/W)

  Insulation under the slopes (R = 6.25 m².K/W)


False ceiling in plasterboard under the slopes

  False ceiling in plasterboard under the slopes


Painting work on new surfaces (Walls and ceilings)

  Painting work on new surfaces (Walls and ceilings)

Step 4/8 — Insulation of lost attics

Do you want to insulate your lost attics?

Removal of existing insulation

  Removal of existing insulation


Roll-out glass wool on the floor (R= 7.50 m².K/W)

  Roll-out glass wool on the floor (R= 7.50 m².K/W)


Sprayed insulation in lost attics (R = 7 m² K/W)

  Sprayed insulation in lost attics (R = 7 m² K/W)

Step 5/8 — Air/water heat pump

Do you want to install an air/water heat pump?

Removal of a large volume heating element (old boiler or other heating device)

 


Removal of a wall-mounted boiler or cast iron radiator

  Removal of a wall-mounted boiler or cast iron radiator


Evacuation and disposal of the existing oil tank

 


Draining of the heating circuit for connection to the existing circuit

  Draining of the heating circuit for connection to the existing circuit


Complete cleaning of the heating circuit

  Complete cleaning of the heating circuit


Installation of an air/water heat pump (outdoor unit and indoor module)

  Installation of an air/water heat pump (outdoor unit and indoor module)


Installation or relocation of a radiator

  Installation or relocation of a radiator

Step 6/8 — Air/air heat pump

Do you want to install an air/air heat pump?

Installation of a reversible air conditioning system (outdoor and indoor unit)

  Installation of a reversible air conditioning system (outdoor and indoor unit)


Installation of an additional unit to the system

  Installation of an additional unit to the system

Step 7/8 — Thermodynamic water heater

Do you want to install a thermodynamic water heater?

Installation of a monobloc thermodynamic water heater

 


Installation of a thermodynamic water heater with an outdoor unit

  Installation of a thermodynamic water heater with an outdoor unit

Step 8/8 — Pellet stove

Do you want to install a pellet stove?

Installation of a pellet stove

 


Complete kit for installing a stove