Step 1/5 — Removal, demolition & disposal

Do you want to remove or demolish elements (floor, wall, radiator, bathtub ...)?

Removal or withdrawal of radiators

  Removal or withdrawal of radiators


Removal of a sanitary element

  Removal of a sanitary element


Removal of a sanitary element such as a cast iron bathtub or water heater

  Removal of a sanitary element such as a cast iron bathtub or water heater


Removal of floor tiles

  Removal of floor tiles


Removal of wall tiles

 

Step 2/5 — Plumbing and installation of elements

Do you want to install sanitary equipment (toilet, shower, sink ...)?

Modification and creation of the networks necessary for the installation of new elements in a bathroom

  Modification and creation of the networks necessary for the installation of new elements in a bathroom


Installation of a shower tray

  Installation of a shower tray


Installation of a shower wall or door

  Installation of a shower wall or door


Installation of a shower column

  Installation of a shower column


Installation of a sink unit including the installation of a sink and faucet

  Installation of a sink unit including the installation of a sink and faucet


Installation of a toilet

  Installation of a toilet


Installation of a radiator or electric towel warmer

  Installation of a radiator or electric towel warmer

Step 3/5 — Electricity and VMC

Do you want to modify or add electrical elements?

Minor electrical modification

  Minor electrical modification


16 A power outlet (recessed installation)

  16 A power outlet (recessed installation)


Light point (recessed installation)

  Light point (recessed installation)


Single switch (recessed installation)

  Single switch (recessed installation)


Installation of a humidity-controlled single flow VMC

  Installation of a humidity-controlled single flow VMC

Step 4/5 — Preliminary work, tiling and ceramics

Do you want to install tiles on the floor and walls?

Preparation of damaged or previously tiled walls

  Preparation of damaged or previously tiled walls


Preparation of damaged or previously tiled floors

  Preparation of damaged or previously tiled floors


Waterproofing of the wet area under the wall tiles

  Waterproofing of the wet area under the wall tiles


Installation of wall tiles only

  Installation of wall tiles only


Installation of floor tiles only

  Installation of floor tiles only

Step 5/5 — Painting

Is there any painting to be planned?

Painting on old substrate (Walls and ceilings)

  Painting on old substrate (Walls and ceilings)


Painting on interior door